The build guide: soldering and first power step by step – and a layout that can be measured

A source

This page is a source of edakit – a concept, a prompt or the rules of a session –, shown as it is in the repository. Read it as such; the guides say what edakit does.

Status 2026-11-11: decided, nothing built – the six questions taken by the owner the same day in a decision round in Claude Code's form, five as recommended and the builder's reading as an agent of its own, and the plan's goal set by the owner afterwards: it tests the build, not the circuit (decision 7), with a test firmware of its own for what the builder sees and hears (decisions 8 and 9; the table at the end). Asked for by the owner after the bell's two through-hole boards arrived bare and a session wrote their build guide: "schreib im edakit projekt ein konzept, dass dieses aufbau dokument beschreibt ... und reg dort an, dass im pcb layout design vielleicht messbarkeit berücksichtigt werden sollte ... uu ein skill, ein agent ... keine ahnung ... überlegt dir im konzept auch, welcher sprachstil verwendet werden soll ... und wie und wann das ganze gemacht werden soll". Written against main at ecd94952.

The experience behind it is two documents written by hand: pytree's docs/aufbau.md and the bell's docs/aufbau.md with its script docs/aufbau.py (automatic_christmas_bell, boards tht and esp32tht, ordered bare on 2026-11-02, delivered on 2026-11-11). Every number below is the bell's.

The short answer

edakit ends at two lists. hand_assembly.md says which parts are fitted by hand (handbook 8.4), and section 6 of the protocol says what the acceptance checks on a delivered board (M-4, handbook 8.5). Between them lies the build: which part goes in when and which way round, what is measured before the board sees power, how it gets power the first time, and what the readings must be. Nothing in edakit holds that today. It existed in the session's head and in the owner's, and both projects wrote it down by hand.

The bell's guide took one session with more than twenty requests and corrections by the owner. Most of its content came from data edakit already holds, and most of the corrections were about the same few things: who the reader is, what state the board is in at each step, and where a probe can be put safely. The proposal has three parts:

  1. The measuring plan as data. A command derives from the graph what is measured on the assembled board to show that it was built right – unpowered and powered –, between which points and with which reading.
  2. The build guide as a document of the project, drafted from that plan and the parts list by a skill, in the register below, with pictures edakit draws, and read by an agent as its builder before the owner reads it.
  3. Measurability as a matter of the layout. The plan goes into the hand-over, a check says where a point of the plan cannot be reached or only next to a foreign net, and the layout review (M-5) judges the rest.

Measured against the yardstick (design as text): the build order, the measuring points and the expected readings exist today only in someone's head. The plan puts them into the repository as text an LLM can write and check.

What the bell's guide contains

485 lines of Markdown in the project's language, German, a PDF of 16 pages built from it, 13 pictures of measuring points and three of resistor colour bands, all drawn by a script of 413 lines. One guide covers both boards; what holds for one only is tagged [THT] or [ESP32 THT].

Part What it says Where its content came from
Parts one row per kind of part with designators, value and the supplier's number on the bag; one cell where both boards take the same part graph, parts entries, the order
Colour bands a drawn resistor per value and where it goes parts entries (value_ohm, tolerance)
Polarity the three parts that matter, each with the rule in the board's own terms: "long leg left, at the printed +" parts entries, the pads' nets in the footprint geometry, the silkscreen
Tools iron, meter with its four modes, what is needed for the first power by hand
Order a table of the steps with the state of the board at each: module in or out, USB on or off, servo on or off by hand: flat parts first, power last
Steps 1–7 one short section per group of parts by hand
Measuring without power supply rail against ground, every LED path by diode test, every button, every line from the module's socket to the connector – each with a picture, the points and the reading, and what a wrong reading means graph: what lies between two nets when the module is out
Measuring with power the rails' voltages with the module in parts entries, simulation
Firmware and test upload, what the board does, in the order the tester sees it the firmware's source
When something fails a table: what you see, the likely cause by hand
Test record every check as a row to tick, with a field for the reading, one sheet per board the sections above

The pictures are the release's board views with the fitted parts drawn over them. A measuring point is a pad of the footprint geometry (boards/<b>.geometry.json) turned into board coordinates with the placement plan, so no point is placed by eye. The script checks that every labelled point lies on the net its label names, and stops otherwise: the first version of the guide had named the wrong socket contact for 3V3, and the check was added after that.

The PDF names the boards' revisions, the commit and its date on the first page and in the header and footer of every page, with a mark when the guide was not committed. A printed sheet on the bench says which state it describes.

What the owner corrected

These are the lessons, each with the correction that taught it. They are the rules a skill would carry.

  • The reader knows electronics. A hobby maker who understands what is written but does not know a colour code by heart. A review "for understandability" added how to read colour bands, what a pull-down is for and what "OL" means. The owner struck all of it: "wir machen keine schulungsunterlage". Lookup aids stay – the band pictures, the supplier's numbers –, explanations go.
  • No framing. The opening that told what the guide would cover went ("jo eh ... streichen"), and so did every reference to the decision log: irrelevant while soldering.
  • The state of the board at every step. "mir ist auch nicht klar, wann ich das modul reinstecken soll un wann nicht und wann ich das teil an die stromversorgung hängen soll und wann nicht". Since then every step opens with one line: module in or out, power on or off.
  • What a measuring step tests, before how. One or two sentences after each heading: what is tested, with or without the module, with or without power.
  • A net's name is not a voltage. "wie kann ich 5V messen, wenn kein modul drinnen ist?" The table said "5V against GND" for a resistance reading on an unpowered board. The guide now names the meter's mode with every step.
  • Pictures show the board as it is at that step. The first measuring pictures showed the bare board; the measuring happens after assembly.
  • The reader has the board in hand. A full-width placement drawing with values was offered and refused: the designators are printed on the board.
  • A record to tick. "ein prüfprotokoll noch einfügen ... also am ende vom testkapitel die ganzen punkte mit abhaken".
  • A warning is a reminder. Asked for where a slipped probe can damage a part; the first version explained two failure mechanisms in eight lines. "die persona weiß das prinzipiell ... nur zur erinnerung ... viel knapper halten". It is two lines now.
  • Remove a hazard before warning of it. The powered 5 V reading was taken at the servo header, where the 5 V pin sits 2.54 mm from ground on one side and from a 3.3 V pin of the module on the other. It moved to the legs of a load resistor 15.5 mm apart. That is the layout's matter, below.

A review with fresh eyes also found what the writing session had not: "senkrecht" read as mounted upright, the "+" printed beside every LED was never mentioned, the sockets of the Nano board are not in the order of the LEDs, and the countdown was described differently from what the firmware does.

The register of a build guide

docs/style.md covers edakit's own documentation. A build guide is a project's document in the project's language, so it needs a register of its own. It stands in the skill build-guide, the agent reads it there, and the handbook points to it (decision 4):

  • Reader: someone who solders and measures, understands a circuit and has the board, the parts and this guide on the bench. The guide is read one step at a time, between two actions.
  • Voice: the reader addressed directly – "du" in a German project, "you" in an English one –, in the imperative or the plain present. One action per sentence, in the order it is done.
  • Content of a step: what to take, where it goes, which way round, how to tell it is right. Then the next step.
  • Left out: why the circuit is as it is, what a part is for, definitions of terms and symbols, the project's history, decision and requirement IDs, what the guide is about to say.
  • Kept: lookup aids – a table, a picture, a number the reader would otherwise look up.
  • Directions: fixed once at the top – the printed side, with one edge named – and used with the same four words throughout. A part is named as it is printed on the board.
  • State: one line at the start of a step that changes or relies on it – what is plugged in, what is powered.
  • Readings: a table with the two points, the meter's mode, the reading with its tolerance and what a wrong reading means. A reading names its unit; a net's name is never used where a voltage could be understood.
  • Bold: only what breaks something when done wrong.
  • Warnings: one or two lines naming the hazard and what to do instead, only where a slip costs a part.
  • Pictures: the board as it looks at that step, never a state the reader has already left.

Two rules edakit's documentation has apply unchanged: one word per thing, and a number with its unit.

Measurability in the layout

Building the bell's boards showed where the layout made measuring harder than it had to be. The owner asked: "hätten wir beim pcb design testpunkte einbauen können/sollen? etwas, dass uns jetzt die arbeit leichter macht?" On a through-hole board dedicated test points were not what was missing. What was:

  • Names at the module's sockets. Ten nets – eleven on the ESP32 board – are measured at the female headers the module plugs into. The print names none of them, so the guide counts contacts in a picture, and on the Nano board they are not in the order of the LEDs.
  • A ground to clip to. Every reading uses ground, and the only place is a 2.54 mm header pin.
  • A rail that is reachable from one side only. The T-Display's 3.3 V comes out at one socket contact. With the module in, it can be probed only at the solder joint on the back.
  • A powered point between two foreign nets. The 5 V pin of the servo header lies between ground and the signal pin, which goes to a 3.3 V pin of the module on the ESP32 board. A probe across two pins shorts the supply or puts 5 V on that pin.
  • One footprint marked differently from its neighbours. The red LED's footprint has its square pad on the anode, the others on the cathode; the guide has to say so.

All five are cheap at layout time and were found on the bench. Four are in the bell's list for a next revision (variants/README.md); the fourth of the list above was found when the owner asked for the warning.

Where a safe point was needed afterwards, the footprint geometry answered: the first candidate, a load resistor's leg, lies 3.5 mm from the pad of a button's pull-down on the ESP32 board; its neighbour has no foreign pad closer than 4.5 mm on either board. That is a computation, not a judgement, and it can run before the order.

The measuring plan

Its goal is the build, not the circuit (decision 7). The owner: "für mich ist es das testen/messen, dass ich richtig aufgebaut habe ... nicht das testen, dass die schaltung an und für sich korrekt ist – das ist eine viel aufwändigere testreihe". The guide takes the circuit as correct: simulation, the reviews and the release gate judge it before the order. From that follows:

  • What gets in. A measurement that finds a fault of the build: a part missing, the wrong part, a part the wrong way round, a solder bridge, an open joint. Each entry names the faults it finds. A measurement that can fail only when the design is wrong stays out.
  • When the plan is complete. For every part fitted by hand: is there an entry that fails when the part is missing, reversed or of the wrong value? That is computed, so the derivation has an end, and the plan lists what no entry covers.
  • What a meter cannot show is an entry of another kind, not a measurement made up for it: a step of the test firmware where the builder sees or hears it ("The test firmware" below), and a visual check in the test record where not even that shows it – a missing decoupling capacitor.
  • Readings and tolerances come from the parts' data: the part's tolerance and the meter's, not the design's margins.
  • A wrong reading names causes of the build only. Once they are ruled out, the guide says in one line that the circuit is the cause, and ends there.

The short-circuit test before the first power and the firmware's test at the end serve the same goal: the first finds a bridge before it costs a part, the second what a meter cannot – an LED lights, a button answers.

The plan is the list of what the guide measures, as data: an ID, the two nets, whether the module is in, whether power is on, the meter's mode and the expected reading. The bell's has four groups, and each follows from the graph:

  • a supply rail against ground without power: what lies between them when the module is out (two 100 Ω load resistors in parallel, 50 Ω) – a short and a missing part both show;
  • a path from a module pin through a series resistor and an LED to ground: a diode test, forward and reversed;
  • a button with its pull resistor: open and pressed;
  • a line from a module pin to a connector pin: continuity, and none to its neighbours.

With power on, each rail's voltage with its tolerance. A project adds what its build needs beyond that; the derived entries are a start, not the limit.

The plan is derived on every run and never edited. What a project adds stands in the graph beside the net it concerns, in [nets."+5V"] (decision 1), so the plan follows every change of the circuit.

The plan has two readers. The guide's tables and pictures are drawn from it. The layout is checked against it.

In the hand-over, as a check, in the review

  • Hand-over. The plan belongs to what the circuit hands to the layout (edakit handover): which nets are measured, which of them under power.
  • A check over the board file and the footprint geometry, for every net of the plan: is there a place a probe reaches on the assembled board – a through-hole pad or lead on the side that stays free, a header pin, a test pad (own.what = "copper") – and, for a net measured under power, how far is the nearest pad of another net. On a board of surface-mount parts only, the first question has no answer without test pads; today nothing says so before the order.
  • Silkscreen. Names beside the contacts of a module's sockets and beside test pads; silk apply already places test points' labels first (handbook 7.7).
  • The review. The layout reviewer (M-5) gets the plan and judges what a number does not: whether a point can be reached with the module plugged in, whether the board can lie flat while it is measured.

The check is a note for a net without a reachable place and a warning for a net measured under power with a foreign pad closer than 4 mm – never an error (decision 2). The 4 mm are provisional: the bell gives three numbers, not a rule – 2.54 mm was the hazard, 3.5 mm was avoided, 4.5 mm was accepted –, so 4 mm reports the first two and not the third. A project can set its own distance, and the second board checks the number.

The test firmware

Added by the owner on 2026-11-11: "den build guide um einen best practice plan bezüglich test-firmware ergänzen ... eine firmware, die einem hilft schnell alles zu überprüfen, was durch sichtprüfung (hörprüfung, etc.) im weitesten sinne überprüfbar ist".

The bell's guide tests with the product's firmware (its chapter 9). To see five LEDs the builder starts a countdown of 60 s, the bell rings at once only on a key combination, and the ESP32 board asks for its Wi-Fi set-up before a button can be tried. The product's firmware shows that the product works. It is slow at showing which part does not.

A test firmware is the plan's third kind of entry, beside the meter and the eye: what the builder perceives when the firmware drives one thing – an LED lights in its colour, a buzzer sounds, a servo moves, a relay clicks, a display shows a pattern – and what the firmware shows when the builder does one thing – a button pressed, a switch set. Its goal is the plan's (decision 7): the board was built right.

What edakit derives. The firmware contract (hardware/firmware.json, handbook 3.5) already holds what such a firmware drives and reads: every pin with its direction and active level, the inputs, the PWM nets, the I2C and SPI devices, the analog inputs with their dividers, the LEDs of every channel. From it the plan gets its steps: one per output with the designators as printed and what is perceived, one per input with what to actuate, one per thing the MCU checks alone – a device answers at its address, an input rests at its pull's level, a rail read through its divider lies in its tolerance. The steps count in the plan's completeness like a measurement: a part fitted by hand is covered by the meter, by the firmware or by the eye. They need the contract ([firmware] in edakit.toml); without it the plan says so in one line and the guide checks with the product's firmware only.

What the project writes. The firmware itself, as a small program of its own beside the product's (decision 8), written by the project's session from the steps and the practice below. edakit gives the list and the practice and no source: the contract has no firmware format, and it stays so (decision 9).

The practice, the rules the skill carries:

  • Of its own, and small. Without the product's Wi-Fi, settings and sequences. It can be ready at the release, before the product's firmware is, and it runs on a board that works only in part. Two uploads per board are its price.
  • One thing at a time, in the order printed on the board. Each output alone, by designator, about 1 s each. A part or a line swapped shows as a wrong order; everything on at once shows nothing.
  • Named as printed. The serial line, and a display where the board has one, names what is driven: "D3 red".
  • Runs without a computer. It starts with the power and repeats; the serial output is an addition.
  • An input answers on an output the walk has already shown to work: a pressed button lights an LED.
  • What the MCU can check alone comes first, reported as one sign – good or bad, a bad one with the designator – before the builder has to watch anything.
  • Fast. One run under a minute per board; no waiting for the product's times.
  • Safe on a board built wrong. One output at a time keeps the current low, an actuator moves a little and is switched off again, and no step relies on a part that may be missing.
  • Says what it is: its name, the boards' revisions and its commit at the start, so the record names what tested.
  • Pins from the contract, never typed, so the firmware follows the graph.

In the guide. A chapter after the measurements with power: upload, then a table of the steps – what is driven, what the builder sees or hears, a box to tick – that is part of the test record. The product's firmware follows with the acceptance steps of the requirements (decision 6), which no longer have to find a reversed LED.

A skill, a command, an agent

The owner left open what does the work. The parts differ in kind, so the proposal splits them:

Part Kind Why
The measuring plan, the pictures, the check that a labelled point lies on its net code – a command computed from the graph, the board file and the geometry; the bell's script shows the size
The steps of the test firmware code – the same command derived from the firmware contract
The test firmware the project's source, written by its session the contract has no firmware format; the practice stands in the skill
The guide's text, its order, the rounds with the owner a skill, build-guide prose in the project's language, in the register above, written in the session that talks to the owner
Measurability a catalog code, a line in the hand-over, a point of the layout review belongs to the layout, before the order
Reading the finished guide as the builder an agent, build-guide-reader fresh context: it does not know the board, as the reader does not

The review that found the ambiguous instructions also added the explanations the owner then struck. The agent has a fixed brief – the reader of the register above, findings only for an instruction that can be misread or is wrong against the data, no additions –, so it keeps the first and does not do the second. It is an agent of its own, not a section of the skill (decision 3): its brief is versioned in one place and it can be started without the skill. Like electrical-reviewer it reads only (Read, Bash) and changes nothing, and it signs nothing while the bell is its only project.

When and how

When What Who
The circuit is handed over the measuring plan is derived and goes into the hand-over the circuit's session
A layout round the check on reach and distance; the names at sockets and test pads the layout's session
The layout review (M-5) the reviewer judges the plan against the board pcb-reviewer
The release the guide's draft: parts, polarity, order, measuring tables and pictures from the released run; the test firmware from the plan's steps the skill, the project's session
The boards are at the maker the agent reads the draft as its builder, then the owner; nothing can change on the board any more, so the guide can be finished while waiting build-guide-reader, the owner, the skill
Delivery the first board is built with the guide; what the bench shows goes back into it the owner, the skill
Every board the test record is filled in; signed, it is the evidence for M-4 the owner

The bell's guide was written on the day the boards arrived, nine days after the order. All of it but the corrections from the bench could have been ready by then.

Which boards. A board that comes bare gets the whole guide. A board the maker assembles gets the parts fitted by hand (hand_assembly.md) and everything from the measuring on. A project with variants gets one guide, with tags where the boards differ.

Kept current. The values a guide quotes can follow the design data the way other documents do ([docs] files, handbook 6.6); the pictures are drawn again by the command. The guide names the boards' revisions and its commit.

The test record and the acceptance. The record's rows and section 6 of the protocol list partly the same checks. They come from one list (decision 6): the acceptance steps of a requirement appear in the record, and the filled-in record, one sheet per board, named in M-4's note, is what M-4 signs. Every row names where it comes from. The measuring plan gives the checks of the build and nothing else (decision 7); the acceptance steps come unchanged from the requirements file, and the plan does not try to prove a requirement.

The PDF. The bell's script turns the Markdown into HTML and prints it with Chromium. edakit builds no PDF; it stays the project's script until a second project wants one, and the header with the revisions and the commit is then the part worth sharing (decision 5).

Steps

Decided, none built. In the order they build on each other:

Step What
BG.1 The measuring plan from the graph: the four groups above, the powered rails, the project's additions from [nets.…], each entry with the faults of the build it finds, and the parts fitted by hand that no entry covers; written as a file of the run, listed in the hand-over
BG.2 The pictures: the board as assembled, a measuring point from the geometry, the check that it lies on its net
BG.3 The skill build-guide with the register, drafting the guide from BG.1, the parts list and BG.2; the test record, with a visual check for what BG.1 leaves uncovered; the handbook's pointer to the register
BG.4 The check on reach and distance – a note, a warning under 4 mm –, its catalog entry; the names at sockets and test pads in the silkscreen
BG.5 The layout reviewer's point; the agent build-guide-reader; the record and section 6 from one list, every row with where it comes from, the record as evidence for M-4
BG.6 The bell's guide rebuilt with BG.1 to BG.3 and compared with the one written by hand
BG.7 The steps of the test firmware from the firmware contract – outputs, inputs, what the MCU checks alone –, counted in the plan's completeness; the line where [firmware] is missing
BG.8 The practice of the test firmware in the skill build-guide; the guide's chapter and the record's rows from BG.7
BG.9 A test firmware for the bell's two boards by BG.7 and BG.8, its run timed against chapter 9 of the guide written by hand

BG.6 is the test: what the generated draft lacks against the hand-written guide is the list of what the skill still has to ask or write. Its measure is the plan's goal: which parts fitted by hand each of the two guides covers.

Decisions

Taken by the owner on 2026-11-11 in a decision round in Claude Code's form, the recommendation first; five of six as recommended. Decision 7 was set by the owner after the round, decisions 8 and 9 were taken in a second round the same day, both as recommended.

# Question Recommendation Alternatives Decision
1 The plan's home derived on every run and never edited, the project's additions in the graph beside the nets they concern a file of the project that starts derived and is then kept by hand; derived only, no additions 2026-11-11: as recommended
2 The check's grade a note for a net without a reachable place, a warning for a net measured under power with a foreign pad too close – not an error an error for the distance; notes only 2026-11-11: as recommended
3 The builder's reading a section of the skill that starts a subagent with a fixed brief; an agent once a second project shows it is worth one an agent of its own; no review, the owner reads alone 2026-11-11: an agent of its own, build-guide-reader
4 The register's home in the skill, the handbook points to it a page of the handbook the skill reads 2026-11-11: as recommended
5 The PDF it stays the project's script until a second project wants one edakit builds it 2026-11-11: as recommended
6 The record and M-4 the filled-in record is the acceptance's evidence, one sheet per board, named in M-4's note; record and section 6 from one list kept apart, M-4 as today 2026-11-11: as recommended; made precise the same day with decision 7 – every row names where it comes from, the plan's rows check the build, the acceptance steps come unchanged from the requirements file
7 The plan's goal – (set by the owner after the round) a plan that also tests whether the circuit is correct: "eine viel aufwändigere testreihe" 2026-11-11: the plan tests that the board was built right, not that the circuit is correct; an entry gets in when it finds a fault of the build, and the plan is complete when every part fitted by hand is covered or listed as uncovered
8 The test firmware's form a small firmware of its own, without the product's Wi-Fi, settings and sequences a test mode of the product's firmware; the project decides 2026-11-11: as recommended
9 How far edakit goes with it the steps derived from the firmware contract and the practice in the skill; the project's session writes the source edakit writes a skeleton for PlatformIO or MicroPython 2026-11-11: as recommended

What Claude had set itself was confirmed the same day: the warning's distance of 4 mm, provisional – it reports the bell's 2.54 mm and 3.5 mm and not its 4.5 mm, a project can set its own, and the second board checks it –; the agent reads only (Read, Bash), changes nothing and signs nothing while the bell is its only project; the test firmware runs without a computer, the serial output an addition, one run takes under a minute per board with about 1 s per output in the order of the designators, and its steps need the firmware contract – without [firmware] the plan says so in one line.